page-banner

Petroleum Exploration (Pvt.) Ltd

BADIN IV SOUTH BLOCK (2468-5)

Introduction

License No: 366/PAK/2005
Location/Districts: Tando Muhammad Khan,Badin, Sujawal
Date of Grant: 05-01-2006
Area (Sq.Km): 864.41
Policy: 2001(Converted to 2012 Policy)
Rules: 2001

Milestones Achieved and Key Features:

Block is located in highly prospective Lower Indus Rift Basin with proven petroleum system comprising Sembar/Lower-Goru formation

3 gas/condensate discoveries have been made and the field has been developed for production. The Government has approved the fields as Marginal as per Marginal Guidelines 2013

18 km of gas collection network has been developed

30 MMCFD Gas Processing Facility has been installed

SSGC has completed 25-28 km pipeline from Field get to tie-in point

First Gas Delivery Date was achieved on February 5th 2020

Multiple ready-to-drill prospects of 3-5TCF gas discovery are available based on a good quality 3D siesmic

Oil/gas is already being produced in the surrounding fields

Excellent gas infrastructure

Good quality sweet gas around 1000BTU/SCF

No high pressure and temperature problems while drilling

Production from Badin IV South fields started in February 2020. Currently Badin IV South fields are producing about 10-12 MMCF/D of good quality gas

Planning to drill Zahrah North-1 exploratory well in the 1st quarter of 2023