Introduction

License No: 151/PAK/2002
Location/Districts: Ghotki, Sukkur, Kashmor
Date of Grant: 13-03-2002
Area (Sq.Km): 129.65
Rules: 1949

Milestones Achieved And Key Features:

Petroleum System is fairly present in the region

Recoverable reserves of 124 BCF in Sui Main Limestone

Badar-1 was drilled in 1994. Currently the well is producing around 9.5 MMSCFD

Badar-1 is on production since 2006 and has produced 69.76 BCF till April 2021

Badar-2 was drilled in 2014 and currently producing at the rate of 5.5 MMSCFD.

Badar -3 well is planned in last quarter 2021, which will further enhance production to about 26MMSCFD

Up-dip potential in Sui Upper Limestone

A Gas Collection Network of around 24.5 km has been established

Dehydration Plant at Badar Gas Field is being installed and commissioned

PEL is in process to initiate the Drilling campaign for Badar-3 to enhance the production from Badar D & P lease